Suit for EPS machine
Description
The wiring of the EPS granulator mainly includes 5 parts:
- Main power wire
- Aviation plug
- Hydraulic station oil pipe connection
- Oil pump
- Conveyor belt
The specific steps for wiring are as follows:
Step 1: Connect three main wires and one neutral wire, making sure that the direction of the fan or motor rotation is consistent with the arrow indicated on it.

Step 2: Match the numbers with the corresponding equipment. Connect the six aviation sockets to to the EPS pelletizer machine electric control box.



1 for drying fan

2 for cutter

3 for high-pressure fan

4 for vibrating screen

5 for feeding fan

6 for crusher
Step 3: This is the oil outlet pipe. The blue valve is the pressure regulating valve of the oil pump, and this is the oil return pipe. The oil outlet pipe and the oil return pipe are connected to the reversing valve.

Step 4: Connect the conveyor belt to the left side of the main electrical control box, and connect the wire of the oil pump to the right side of the main electrical control box as shown in the video.


Additional Notes:

Conveyor belt wiring

Mix wiring
Video
Leave a Message






