
Power failure recovery function for EPS cutting line
In the event of a power failure, the EPS cutting line has a recovery function that allows the cutting process to continue from where it left off. However, manual intervention is required to sort out the EPS boards dropped in the destacker station and reset the stacking station. The clamps in the stacking station need to be manually lowered and the EPS packets need to be put back into the sorting station conveyor.
Description
When the EPS cutting line encounters a sudden power failure, the system will prompt “whether to continue the last cutting” on the touch screen after the power is turned on, choose “yes”, that is, you can continue to run the EPS cutting line from the place where the power failure occurred last time. However, there are two places in the cutting line except for the destacker and stacking stations, assuming that both destacker and stacking are clamping during the power failure:
Destacker station:
- After a sudden power failure, the original clamps will be loosened because of the power failure, and at this time, the EPS boards in the destacker station have already dropped on the roll surface or lower layers EPS boards, and those dropped in the destacker station need to be manually sorted out by the worker.
- The entire destacker process does not need to be emptied.
Stacking station:
- The clamps do not retract after a power failure, but the counting function is disabled and the stacking loses its original position.
- Workers manually operate the touch screen to control the stacking clamp, lower it to the roller surface, and release the EPS small package.
- Worker manually empties the stacking station.
- The stacking station is reset.
- The worker manually puts the EPS packets back into the stacking sorting station conveyor.
Suit for EPS machine
Photo

Leave a Message




