
Loading container method for EPS production line
Two methods of loading containers for EPS production line shipping are disassembly into small parts and maintaining the structure as much as possible. Disassembly saves container space and reduces sea freight costs but requires more time for disassembly and reassembly. Maintaining the structure allows for quicker assembly and production start but doesn’t fully utilize container space. The chosen method depends on factors like sea freight, customer production needs, and other practical considerations.
Description
When our customers order the EPS production lines from us, we need several containers for shipping.
We can provide normal two method of loading containers:
Disassembly into small parts
By welding metal brackets, different mechanical structures can be installed on a single bracket. In this way, we can save more space from the Z-axis. The purpose is to save the number of containers and maximize the use of container volume.
- Advantage: Minimize the number of containers as much as possible, ultimately helping customers save on sea freight.
- Disadvantage: Because we need to plan in advance, we will spend more time disassembling and welding brackets; similarly, customers also need more time for assembly after receiving the products.
But please rest assured, the assembly process will be directed by our dispatched technicians. We can also provide complete installation drawings and a full set of installation labels.




Completed disassembly pictures






Maintain the structure as much as possible
During the disassembly stage, We’re shipping out as fully loaded as possible.
- Advantage: Customers can try to assemble as soon as they receive the goods and put them into production as soon as possible.
- Disadvantage: The space of the container cannot be fully utilized.




The specific loading container plan needs to consider factors such as sea freight, customer production needs, and other actual factors.
Leave a Message




