
How to replace the ball plunger of copper wire holder with detailed steps for EPS cutting machine
To replace the ball plunger of a copper wire holder for an EPS cutting machine, it is recommended to avoid or minimize the use of lubricating oil. The steps for replacing the ball head plunger include sorting the copper slides, cleaning and grinding them, and gently knocking the ball head plunger into the copper slide with a 6mm small shaft. Finally, install and test the copper slide one by one using the guide rail.
Suit for EPS machine
Description
According to customer feedback, there is slight burning on the surface of the copper wire holder during use, so it is recommended to avoid or minimize the use of lubricating oil!
90% of the friction resistance comes from the nylon wire holder and the guide rail. Friction resistance between the copper wire holder and the guide rail can be ignored, so it is recommended not to use lubricating oil for the copper wire holder! Use a soft absorbent cloth to apply a small amount of white oil to the slider shaft (note to use turbine oil or white oil, the oil should be thin)!
The copper wire holder needs to be effectively conductive. Once impurities and dirt cause poor electrical contact, the copper wire holder must be kept clean. If the copper wire holder uses lubricant oil, it will have the opposite effect.
Reference steps
The steps for replacing the ball head plunger are as follows:

Step 1: Sort the repaired copper wire holder! Discard those with large wear on the inner hole, skew wear, burnt inner holes, and conductive angles that have no repair value!

Step 2: As the example shows, those severely burnt and damaged are discarded, and those with mild damage are classified as substandard. After maintenance, the copper wire holder error should be tested to ensure it is within 0.5mm, You can also compare and verify the good ones on the guide rail. Those whose deviation exceeds 0.5mm should be discarded!

Step 3: Use a steel needle or pointed nail hammer to knock out the bad ball head plunger!

Step 4: After selection, clean the copper wire holders that need to be repaired with coal oil or thinner oil, to clean the oil stains!

Step 5: Use 300-500 # sandpaper to slightly grind both sides and sections of the copper wire holder to the copper metal, facilitating electrical conductivity and parallel arrangement.

Step 6: For slight burn marks on the inner wall, use sandpaper above 300# to grind and polish. Control the amount of grinding to reveal the color of the copper metal on the inner wall. Those with severe burn marks and uneven grinding should be discarded!

Step 7: Compare the grinding effects!

Step 8: Brush and wash twice, rinse off the dirt, and blow dry with a compressed air gun.

Step 9: Use a bench vise or a specialized slot to place the copper wire holder flat, and gently knock the ball head plunger into the copper wire holder with a 6mm small shaft, the main body of the plunger being lower than the inner wall of the copper slide!

Step 10: Finally, check for compliance, put it back, and install and test the copper wire holder one by one.
Leave a Message





