
Frequently Asked Questions
There has multiple way to reach us, please contact us by website live chat, email, or phone number, forms, our expert will contact with you within 8 working hours.
We can send the quotation lists when get the detail inquire.
Welcome to reach us now.
How to detect the load capacity of the EPP foam pallet?
Load capacity testing product range
Cardboard box load testing, pallet load testing, plastic pallet load testing, hook load testing, escalator load testing, rubber wheel load testing, glass load testing, glass glue load testing, shelf load testing, hinge load testing, handbag load testing, slide rail load testing, cardboard load testing, plastic bag load testing, hook load testing, etc.
Regular load testing items:
- Load testing
- Static load testing
- Dynamic load testing
- Load time testing
- Load limit testing
- Load durability testing
- Vibration load testing
- Non-standard testing
- Performance testing
If you have other needs, you can directly contact the laboratory engineer to provide you with answers.
Step:
First, you need to communicate with your end customers and ask them what data they need to test.
Secondly, We suggest that you find a corresponding load testing company in the local market, provide the EPP foam pallet produced by your company, and send it to their laboratory for testing.
Third: Testing report, after the testing, the testing company will provide a corresponding report.
Tips:
In addition, the load of the EPP foam pallet has a very large relationship with the density. Generally, the higher the density, the stronger the load capacity, but the corresponding production cost is also higher.
It’s depended on what you have ordered, below is regular delivery for your reference.
EPS Expandable Polystyrene machine: 60 days
EPS Expandable Polystyrene mold: 20-30 days.
EPS Expandable Polystyrene machine spare parts: 3-7 days.
The standard delivery term for EPS machine is
- EXW Factory
- FOB Ningbo or Shanghai
- CIF
Welcome to contact us to get more information
Both T/T and LC at sight is available.
For more information, please contact us
13 months from date of shipment, excluding quick-wear part
Sure, We usually send 2 technicians to the customer’s factory together to assemble and testing the EPS machine until it is ready for production.
For some special areas of the country, if it is not convenient to send technical personnel abroad, we welcome customers to visit us in China EPS machine factory, we provide onsite EPS machine assembling and installation service, make sure the EPS machine in the customer’s factory can be assembled smoothly.
Yes, we have training book and provide the training service till customer gain all the skill of operation the machine and ready for production
YES, we offer EPS turnkey projects, but we only produce EPS machine, other auxiliary equipment like steam boiler, steam tank, air compressor air, compressed air tank etc. are produced by our supporting outsourcing factories.
Most important, we provide the overall turnkey installation and testing service, and be responsible for the turnkey results.
Yes, we provide EPS machine layouts and pipe layouts for the EPS plant for free.
No, we produce the EPS Styrofoam machine equipment based on each customer’s unique request.so we do not have stock to sell.
But for EPS machine spare parts, we may have some stock, please contact us before placing order.
Our company located in Hangzhou city, Zhejiang province, where is about 1 hour from Shanghai by train and 1.5 hours from Guangzhou by airplane.
There has an EPS machine basement in my city. We keep a sharp eye on the EPS machine business and bring the constant value information to our customer worldwide.
If you have any questions for EPS machine, please contact us here.
Hey guys, we worked from home on Feb 10, EPS factory opened on Feb 17, we requested to check the body temperature each day before entry into the factory in the morning and check the body temperature before left the factory.
We do daily disinfection to workshop.


Yes, it’s safe, people receiving packages from China EPS machine supplier are not at risk of contracting #2019nCoV.
From previous analysis, we know coronaviruses do not survive long on object, such as letters or packages.
We believe everything will be fine soon.
Different manufacturer may have different plan according to each situation, I am giving our company’s plan as below:
Working at home: Feb 10-Feb 14
Working in the office: after Feb 17
I wish you all Stay health and stay happy.
If you have any questions for EPS machine, please contact us here.