EPS recycling pelletizer machine start-up and shutdown steps
This document outlines the start-up and shutdown steps for an EPS recycling pelletizer machine. Steps include connecting wires and tubes, turning on switches, debugging rotation, heating the machine, and adjusting settings for extruding PS threads. Shutdown steps include stopping the crusher and feeding fan, confirming the material is finished, and turning off all appliances and switches.
Description
Put the machine as requested, also can adjust the location according to your site
After material and machine are put in place
- Connect all the wire between the machine
- simply follow the instructions of the degital and insert it into the air plug
- connect all the soft tube
Open the electrical box switch
- connect the three phase wire in turn
- connect null wire
- connect ground wire
open the total power switch
Rotate the emergency stop button, if the power light is lit up,that indicating there is electricity. in special circumstances during working, press the emergency stop button,make the machine stop. then rotate the emergency switch again,make the machine electricity.
Debug the machine ‘s positive and reverse rotation. if it is first starting and no material in the screw. Press the 1st extruder button, according to the arrow, observe the direction of the belt pulley, if reversal, adjust the wire connection, then put the filter into the die head ,turn on the oil pump switch, twitch reversing valve, put the mesh into the filter, hold the mesh when twitch reversing valve,pulling the filter with mesh into the die head, turn off the oil pump,(Skip this step if you already has mesh inside), open the heating button ,set temperature.
there have two temperature ,the top one is actual temperature,the below one is set temperature,generally the temperature is between 180-220 degrees
If the machine is used and there is material in the screw,it must be heating to the specified temperature, test the direction(only for first time assebmly), and change the mesh, Must not start the machine when it is cold, it will cause the screw break. When the temperature reaches the set temperature, keep it for 10-20 minutes so that the screw and die head can be heated evenly.
Start the crusher motor, feeding motor, blow dry motor, cutter,vibration motor ,discharge motor ,and feeding the material into the crusher, observe the silo, when the material reaches more than half, turn on the 1st extruder , 2nd extruder and the mixing motor. Slowly realease the movable plate to three quarters, wait for the material to extruder from the 1st extruduction, observe the melting degree of the material, if the material is hard, raise the temperature, if the material is too rare, lower the temperature, wait for the material to flow into the entrance of the second extruder, looking at the size of material,adjust the 2nd extruder screw speed according to the diameter of the extruded PS threads, and flow out from the second extruder. If the water temperature is too cold, shorten the distance in the water for extruded PS threads,in order to avoid the material become brittle, and can not be cut,if the water temperature is too high, the extruded PS threads will be stick together, at this time, you need to open the cooling water inlet valve to lower water temperature, using the blow dry fan to dry the water on the surface of PS threads ,and then the PS threads will follow the direction of the guide plate enter the cutter, check the PS threads’s diameter to adjust the speed of the cutter to make the grannuals evenly .
Shut down steps
- First close crusher and feeding fan,
- ovserve the silo and confrim the material is finished,
- close the mixing motor
- close the manual removable plate under the silo
- close temperature control parts and all the appliances,
- change the new mesh in the die head
- shut off the main switch .